Close

Santa Clara River Trail Closure Near Bridgeport Park Begins August 26 img:is([sizes="auto" i], [sizes^="auto," i]) { contain-intrinsic-size: 3000px 1500px } Santa Clara River Trail Closure Near Bridgeport Park Begins August 26

Santa Clara River Trail Closure Near Bridgeport Park Begins August 26 img:is([sizes="auto" i], [sizes^="auto," i]) { contain-intrinsic-size: 3000px 1500px } Santa Clara River Trail Closure Near Bridgeport Park Begins August 26
Go to top of page
Source: KHTS Hometown Station
Date: 08/21/2026 12:43pm

Article Summary:
Santa Clara River Trail Near Bridgeport Park to Close Aug. 26 for Pipeline Construction
The Santa Clara River Trail near Bridgeport Park and Bridgeport Elementary School will close from August 26 through late September 2026 for pipeline installation tied to SCV Water’s S Wells PFAS Treatment and Disinfection Facility. Trail users should follow the signed detour along Bridgeport Lane between Bayside Lane and Parkwood Lane.

Read article here »